We were invited into the school in 2023 to take some photographs before any planned changes were to take place. These are some of the pictures taken.
The pictures below show the timber cladding to the underside of the Class 4 roof and the mezzanine floors at each end.
These pictures show the timber cladding to the underside of the Class 4 roof and the mezzanine floors at each end.
Theses are from the Main Hall with entrance from Main Reception and children’s lockers
These show the Kitchen Serving Hatch from the Hall and the Kitchen internals
These are of the Reception Classroom which was made from the external shelter that was on the upper playground
Here are the Breakfast Room and the Staff Room
Finally the bottom playground external shelter and the underside of its roof.